Highline Glenwood and 404 Glenwood at The Creamery

I would be pleased if it “completely changed the neighborhood”. It needs a re-balance.

1 Like

Peeking up from the platform at Union Station. Will be nice to see it come into frame when rolling in on the ol’ Amtrak.

24 Likes

This looks fabulous and is very impactful for the area. Thanks for sharing!

1 Like

We working on floor 26. 11 more to go

33 Likes

A way to visualize the full height is to add the height of the non-glazed portion on top of its current height. She’s gonna look pretty tall because she’s slender!

15 Likes

Amazing. 5 more of these, please.

12 Likes

finally a tall building going up downtown. The Creamery today. Good thing I was on foot I parked at Moore Square (more on that later) and walked over here. With the marathon closing streets everywhere downtown.

27 Likes

Taken from its shadow. I hope you can see it.

15 Likes

No fucking clue what I’m looking at, here…

11 Likes

View (5X) from the Village District.

This will be close to the rooftop bar’s patio view from The Oberlin hotel located a couple of blocks east of here.

21 Likes

27 Likes

Amazing shot with the tower crane starting to disappear into the fog!

7 Likes

From Sunday.

31 Likes

Textures….from the West End. :blush:

20 Likes

Ignoring today’s weather, I heard they are ahead of schedule on the concrete pours given the overall great weathering during the project, and expect to top out early 2027 (this means they are raising the tower crane for the final time soon!).

14 Likes

This is actually the speed that I thought it would go from the start. I suppose they built a lot of weather contingency into the project schedule?

2 Likes

Well… we have been in a pretty bad drought, so they likely just planned for normal rain delays during construction, but instead have had barely any rain delays hahaha

5 Likes

Unlike the NCDOT that plans for 365 consecutive days of 75 and sunny when generating timelines…

8 Likes

24 Likes

28 Likes