AMA: GoTriangle Commuter Rail Project - Sept 23 1-3pm

Is the entire commuter rail corridor going to be double tracked?

ANSWER: Phase 1 of this study indicated that double-tracking would be required to support the proposed level of service. The current phase of study should give us a better idea of the needed track infrastructure.

7 Likes