The Southern Gateway Corridor study was adopted in 2017 (you can download the study from this page https://raleighnc.gov/SupportPages/adopted-plans). There hasn’t been much movement yet, but I’m sure things will start happening whenever Downtown South and Park City South (or whatever it’s currently called) get going.
6 Likes