It was me. I was frequent posters.
![]()
That’d be a “fortunately” from me. That’s how most “real” cities develop and build out, man lol
This week the Raleigh City Council approved rezoning for Beacon Partners’ Eastside Design District along Capital Boulevard next to Salvage Yard and Raleigh Iron Works, allowing the site to eventually reach 20 stories. The first phase will adapt the existing Johnson Brothers facility into about 250,000 square feet of creative office and retail space, while Beacon also plans a 7-story, 380-unit apartment building, a 1.5-acre green space and amphitheater, pedestrian connections to the Crabtree Creek Greenway, and a new linear park along the existing rail spur. Construction is expected to begin in Q1 2027 after Johnson Brothers relocates, with taller office and multifamily buildings planned later as part of a broader effort to turn the midtown corridor into a more walkable mixed-use district.
I’m really looking forward to seeing how all of this comes together in a couple of years. I do think this area (Iron District) will eventually rival North Hills/Fenton in popularity 5-10 years from now, but with a much grittier/real-world vibe (which is what I’d prefer, honestly). I do like North Hills and Fenton, but I’d love some variety as well.
Interested to see how they make this pedestrian connection to the Greenway. The Greenway runs on the north side of Crabtree Creek here, so they would need some sort of bridge to connect.
Nothing would make me happier than a bridge connecting the greenway to this development.
Looks like the city is preparing to extend the Atlantic Ave multi-use path, recently completed as part of the larger road project, south from Highwoods Blvd to Salvage Yard: Atlantic Avenue Multi-Use Path Project | Raleighnc.gov
Fantastic. The bike infrastructure is horrible in this area.
This is on the city’s AMP (Active Mobility Plan), part of the Big Jump (50mi of new+upgraded bike lanes in 5 years). Glad to see the city following through on it – pluck that low-hanging fruit!
For those unfamiliar with the area, this will allow cyclists to get from Iron Works to the greenway without having to get on Atlantic, and it will allow walkers to get the the greenway at all, as it is less than a quarter mile away but there are no sidewalks here currently
This is also a crucial piece of better-connecting downtown to the greenway system. Separated bike lanes along Wake Forest and Atlantic is also on the AMP/Big Jump plan. Once those are in place, along with this section, it will be a straight shot up Person St → Wake Forest → Atlantic → Crabtree Creek Greenway, all on separated (I think??) bike lanes. The current best route takes you a couple miles out of the way, routing much further east over basically to Crabtree Blvd
I’m curious which side of the street it’s going to be located.
It should be on the eastern / Iron Works side. A stub of MUP already exists on that side. It was laid down when Iron Works was developed, but currently it ends right at the edge of Iron Works
Nice. The city gets so much bang for the buck when connecting existing assets like that.
I wonder if they will widen the bridge over Crabtree creek or build a new one to the side.
Love this. I tried to walk from Ironworks to the Ritz for a concert a few years ago, and it was way harder that I was expecting for such a short distance.
ASR submitted for the apartment building to go with the Eastside Design District re-development, looks to be on the south end of the site.
6-story, 408 units.
Where exactly is this? I can’t seem to picture where this falls on the map. (Pardon my ignorance)
Where were the renderings from if you’d be so kind sir
Cline Design’s website - looks like they are moving their offices into one of the redeveloped warehouses too.








