This thing is really taking shape quickly.
Some street level pics from yesterday evening.
I’m curious what these small block towers are for. I was thinking trash/recycle chutes but there are so many in close proximity.
Those are the affordable housing units.
They could be chases for vent piping to run through to the roof. It pulls the piping out of the walls and would presumably have some level of fire protection with the cinder block walls. Just a guess though.
That is interesting. I would think a trash chute would just be wood framed and covered with vinyl or sheet metal. Being masonry, I would think these are something more structural. Let’s continue to follow this story
I don’t think the primary purpose is structural, because there’s openings at the plenums (which also eliminates the possibility that it’s trash chutes – I would think those openings would be at a reachable height at each level, whereas these appear to be just below the floor).
That seems to indicate these are mechanical shafts (openings for ducts or piping), and the concrete is just a way of achieving the required fire protection – a 2 hour rating is required if connecting >4 floors. I’ve never worked on a wood-framed building, but I’m pretty sure shafts are usually just built out of studs and a fire-rated shaft-liner though… so maybe you’re right that they went with CMU to add some lateral stability.
Phase 2… coming up… ASR-0076-2022… described as “Mixed used building with associated parking deck and utilities.” Waiting for the upload to the city site for more detail.
What are the odds he says “F it” and goes for the 20-story rezoning again?
Zoned IX-7-UL. The most recent plan was a pair of 7-story mass timber office buildings. Curious that its described as just “mixed use”. Typically residential buildings mention that in the description.
Ok so this is just the forthcoming development proposal, not a request… .damn
Please be fully concealed parking…pleaseeee
This is tearing me in a couple of different directions.
I’m initially excited to see activity for this 2nd phase and can’t wait to see what they’re proposing.
I’m also disappointed there wasn’t a rezoning request. If you’re looking into the future and West St is connected under the tracks, this becomes a REALLY well connected property to public transit and if we need height anywhere, this is one of the more important areas for sure. I’d rather see this take longer and be DX-20.
Straight from my inbox:
Kane Realty Introduces Second Mixed-Use Project in Raleigh’s West End
Plans submitted for 240 apartments, 4,000 SF retail, and parking in Downtown Raleigh
RALEIGH, N.C. (Sept. 2, 2022) – Kane Realty Corporation has revealed plans for its second mixed-use development in the West End, the emerging Downtown Raleigh neighborhood adjacent to the Warehouse District. Occupying just over two acres at the corner of S. West Street and W. Cabarrus Street, the as-yet unnamed project will feature five floors of apartments atop two stories of parking, totaling 290 spaces. An active ground level will feature 4,000 SF of retail space, joining 26,000 SF of ground-floor retail at Platform, Kane’s first development in the West End, currently under construction and scheduled to open in January 2024.
“Downtown Raleigh has seen tremendous growth over the past several years, with no signs of slowing down,” said Bonner Gaylord, Chief Operating Officer at Kane Realty Corporation. “West End is a vibrant neighborhood with a fantastic variety of locally owned businesses. Between Platform and this newest development, we are thrilled to introduce even more options to live, work, dine, and shop in Downtown’s West End.”
In addition to its collection of 240 studio and 1-, 2- and 3-bedroom apartments, Kane’s new development will feature an array of top-tier community amenities. Residents will enjoy indoor/outdoor social and coworking spaces, a robust fitness center, a large central pool with sundeck, and a top-floor sky lounge with views of the West End, the Warehouse District, and Downtown Raleigh. With a location immediately adjacent to the city-planned West Street extension, this development will also provide residents and visitors with walkable and bikeable access directly to the Warehouse District.
Dwell Design Studio is the architecture firm for this development, with local firms McAdams, Stewart, and Lynch Mykins rounding out the design team. Groundbreaking is slated for Summer 2023, with construction anticipated to be complete in Spring 2025.
You just beat me to it… here’s the WRAL link for safekeeping as well:
Interesting how for branding purposes they seem to be creating their own sub-district name (West End) since the Warehouse District includes this area south of the tracks.
Since their parking deck entrance is from the west street extension tunnel, at least that means that that project must also be on this 2023-2024 timeline.
Looks great as far as 5 over 1s go. Is this replacing those mass timber office buildings though? Bummer if that’s the case.
Also, re: 4000 sf retail, It seems like in our market, developers are hesitant to overdo it if there’s a lot of retail nearby, while it seems like in some other cities the assumption is that the ground level in active areas is almost always going to be public/retail. Wish we had that attitude here so we didn’t end up with dead-zones along facades of these huge buildings.
First time seeing (or paying attention to) this. What the hell is that fenced-in corner?
The gas pipe infrastructure.
“The new, unnamed project will have 240 apartments, 290 parking spaces and 4,000 square feet of retail space. The building will be five floors of residences on top of two floors of parking while the retail will be at street level.” https://www.bizjournals.com/triangle/news/2022/09/02/kane-realty-west-end-raleigh-next-phase-apartments.html
AND LOOK WHAT ELSE IS BACK ON THE TABLE FOR KANE ACCORDING TO THE THE SAME BIZ ARTICLE: The other development in the West End project is the West Cabarrus Warehouses where plans are to renovate two industrial buildings at 518 S. West St. into a retail and dining hub.