Berkley’s moving out in November but does that mean this tower will start construction soon after? They haven’t passed their ASR yet but the most recently ASR review submitted the issue list is pretty small.
Fingers crossed for a 2024 construction start date?
Also, the tower after the 10th floor will not be square but L shaped:
Hopefully it has not run into a major snag. The lastest on the city’s website (entry from 5/4) indicates “Not passed”. I was not sure how to find out additonal info, if possible.
I dug a little deeper and found the Plan Corrections Report and it has a ton of line items to addresss. No sure if that is typical or not. You’ll need to donwload the PDF attachment to review.
I would be surprised if this is the next tower to go up in downtown Raleigh. There hasn’t been groundbreaking of a tower of 10 stories or taller in downtown Raleigh for a long time.