The Station design is the same as the most recent rendering based on the website. The tower portion is going to be shorter but won’t start construction until next year or so.
That represents the final height (of the latest draft) of the tower.
Looks like they’re almost done with the parking sign anchors. Soon we get stripes, curbs and the pay machine!
Gravel? WE DON’T NEED NO STINKING GRAVEL!!!
Are we ready for the cranes base
is that possibly a good paradigm to follow?
Did you get pictures
I’d prefer that over no medium-to-large development at all
I’m with Pedro. Anyone have any pictures of this project?
Better yet, a webcam
Maybe, but you’re supposed to ask about it in a different thread.
That’s a good point, and I would also like to see a webcam and pictures crack head.
At this rate the Charlotte Gateway Amtrak Station project will be finished before the RUSBUS and I’m pretty sure the Gateway Project isn’t even expected to start construction until 2026 lol.
Maybe the Peace St project will finish before this one.
Kind of a grumpy reaction for a shot of them actually constructing RUSBUS.