A post was merged into an existing topic: 301 Hillsborough / Raleigh Crossing
FWIW the Kimpton website is saying 2025 for that one so yeah, gonna be a while.
https://www.ihg.com/kimptonhotels/content/us/en/stay/boutique-hotels-in-raleigh
They take their time…hopefully worth it
Can see some pictures of the construction
I’ll go at lunch but I don’t think there’s anything visible. I’d imagine it’s gutting and prepping the warehouse for demo
From what I’ve been told, there’s 8 weeks worth of hazmat abatement in this warehouse
The only thing visible here are new barriers along West St. Nothing really interesting yet except to say they’re definitely working!
This one will be very slow
The first pic is a great example of just how much of a street-level impact this project could have if it is truly given the ample retail space that is promised - imagine once all the Dillon retail spaces are full, then this - could actually become Raleigh’s first legit retail corridor.
Very true.
There’s also a real possibility that the retail corridor you mention could extend from SmoHo on the north to The Depot on the south along both West and Harrington.
What a great shopping “loop” that could be!
I guessing that demo will soon start probably in three weeks the old building is tear down or 4 weeks
I’m afraid it will take quite a bit longer than that, Pedro. Asbestos removal and other site preparation has to be done.
And should be topped out by Christmas!
Agree with @JWH, gonna be a bit before we see demo then ground breaking.
Okay now I understand sir
No tear down; they will be saving as much of the existing facade as possible. I believe there may be one stretch that will be demo’d for the new building to front the street, but AFAIK they are building the new tower out of the existing facade much like the Dillon.
just the sections at the corners.
Nothing new but:
https://www.instagram.com/p/CePKNPUMSi9/?igshid=MDJmNzVkMjY=