Concrete retention wall along west and north side of property is done. Stairwell and elevator shafts are starting to take shape. Lots of first floor supports ready to go.
I don’t know what it is, maybe because I pass daily, but this project just feels like it is c. r. a. w. l. i. n. g. along.
Will this be poured concrete all the way up, or will they switch over to steel when they get above the parking levels?
Man all these projects are really taking a long time on the ground floor.
I think that’s pretty typical for the ground to take the longest by far.
Gotta make sure that foundation is SOLID AF before putting 11 more stories on top of it!