Village District Developments

Yep!! I saw that this morning, but couldn’t get a pic. But it is imminent! :building_construction:

3 Likes

I keep forgetting about this one. Excited for a hotel here, and hopefully a cool rooftop bar for me to visit, since I doubt I’ll be taking a staycation 3 miles from my house.

5 Likes

https://www.bizjournals.com/triangle/news/2024/03/04/raleigh-oberlin-road-construction-streetscape.html

New article about improvements to Oberlin Road. This is the first time I’m seeing this type of streetscape in Raleigh.

22 Likes

Amazing how you can change up the streetscape and road configurations when you pack an area with a lot of housing, huh?

6 Likes

A fun little three-unit condo development on a narrow slice of land north of Village District.

https://community.dtraleigh.com/t/the-raleigh-wire-service/748/2301?u=oakcityyimby

3 Likes

So, it looks like the owner is just adding another unit to an existing duplex.
It’s like a duplex is getting an attached ADU.

2 Likes

9 Likes

BOOOOOO! Was hoping that building might be prime for demo and redevelopment (the building footprint + some surrounding parking lot would be enough for one of those 5-7 story apartment towers that you see all down Hillsborough now)

I think this will do well! Fits the vibe of the neighborhood and gives an actual bar option in an area pretty much void of one.

2 Likes

Not even that, the ADU already exists. There is no construction scope in this proposal at all; it’s just reclassifying one duplex + ADU into 3 units of FTDO (had to look that up – Frequent Transit Development Option)

So… is this basically just codifying the FTDO classification of this site so that the owner can redevelop it more densely in the future?

2 Likes

Interesting, I noticed some of the exterior of the building was removed, wondering if they’re changing it or just doing repairs. Glad to see some movement.

2 Likes

I’ve been riding this section every now and then to check the progress. It’s coming along, but I could have sworn the original completion was spring 2024 which is what prompted me to start riding over there more often. Once I saw the end of Jan that it was taking a bit, I checked again and thought it then said Summer 2024. Now I’m seeing Fall 2024.

I’m crossing my fingers the bike lanes are completed before then. I’ll ride this section with the ebike quite a bit. I probably won’t mind it on my regular bike either other than the fact it does turn into the typical sharrows in sections (why can’t we have an actual cycle track or actual separated bike lanes?).

I do think this will be a great improvement for the area and am excited for it.

2 Likes

We need some buildings like this one in this area:

Source: https://x.com/cobylefko/status/1768058767927599314?s=46

20 Likes

I would love if they started redeveloping some of the larger parking lot areas into 3-5 story strips of retail with apartments above, allow a bunch of current retailers to move over to them, then start redeveloping the current retail strips with the same.

10 Likes

But where would I park…

In one of the soon-to-be many parking decks in Cam. Village lol - there’s the new hotel coming in that will have extra spaces, the new apt building deck looks enormous… gotta have room to share in there. The Wake County library deck. And then I imagine one of the lots could be developed into a deck with wrapped apartments that could handle it. Can even make some street parallel parking work between the new buildings.

5 Likes

Potentially underground in 1 story garages under the new buildings along with the remaining surface spots :man_shrugging:t4:

1 Like

Okay you guys have convinced me.

1 Like


Demolition for the hotel.

17 Likes


Those new apartment looming over da’ village.

18 Likes