301 Hillsborough / Raleigh Crossing

20 Likes

From the blog, I didn’t realize there was buildings on this lot as recently as 2007. Does anyone have pics of what was there before the parking lot?

2 Likes

Great picture! My thanks! :hugs:

Funny, that crane doesn’t look so tall now…? :thinking:

1 Like

You can go to Imaps and they have aerial photography going back to 1981. This is 1988.

6 Likes

You have to go way back but I do have photos of the site from 2007.



17 Likes

Who dat in the profile pic. New Leo? (@dtraleigh)

6 Likes

Wow, completely forgot that building existed.

And for good reason… :grimacing:

1 Like

Ya, that one was rough on the eyes.

The building spanning the block north to south was a motor lodge I think. Goodnight Raleigh had a picture a while back I think.Yep, found it. The Downtowner Motor Inn.

6 Likes

Soar baby SOAR!!!

2 Likes

Lol hahaha hahaha lol funny

1 Like

Yeah me too. I moved back to Raleigh in 2007 and drove thru downtown quite a bit since then. Had been away for about 3 years, but didn’t really spend much time downtown even then since the late 90s.

I moved to Raleigh in 1969 and drove along Hillsborough St often but for some reason just do not recall the Downtowner while I do recall the Holiday Inn :grin:. I also recall the building along Dawson after seeing the picture. Guess they both were removed while I was living outside Raleigh and just got use to not seeing them, or many they just were not worth seeing LOL.

2 Likes

New pics

14 Likes

The Real Estate project manager for the Fallon Company just posted a drone photo of the progress.


He then answered some questions in the comments. Early winter 2021 completion date,
Phase 2 should start in 12-18 months

22 Likes

That’s interesting they had previously been saying that phase 2 would start very soon.

2 Likes

Yes. That’s a major bummer that they’re saying over a year to a year and half before even starting the residential portions. TBJ had quoted them saying 1H 2020.

2 Likes

I noticed the current status of the project only takes up about half of the block, whereas the proposal shows the entire block being filled. Will the brick house and adjoining buildings be destroyed as part of the next phases?

1 Like

Personally I think they are making a mistake by delaying it. FNB obviously just delivered it’s units and Smokey hollow has 700 opening this year but other than that there arnt any big rental projects under construction in DTR if these were to open in a year and a half or so I think they would be the only thing coming online. Especially since the time line for nexus is now extended.

9 Likes