301 Hillsborough / Raleigh Crossing

Getting some more height

20 Likes

:drooling_face:
Thank you!

Now, where is my construction cam? :sob:

7 Likes

For today’s performance, the construction cam role is being played by @TedF

10 Likes

Several angles of 301’s progress.

29 Likes

There are gonna be some great views from inside these buildings. Thanks for the shots!!

3 Likes

Thank you for the pictures they are amazing, it’s making me want to buy a drone

6 Likes

That last shot with downtown in the background shows how much more impact this tower will have compared to the FNB 22-story tower, which is barely visible. The 301H office tower will be about as high, but will really be able to show off from all sides with so much clearance around it.

Of course it’s going to start getting crowded when the other two building join the 301H pedestal and also the 400H project which should pop into skyline views on this side of town.

6 Likes

Seriously hoping 400H ends up going taller now that it’s changed hands and the height restrictions have been released… would be an amazing connector of Glenwood South to downtown proper. Mainly just want to see some height variation between it and 301H, since all 3 of those “towers” will be exactly the same height which IMO is gonna look so blah.

8 Likes

New pics

20 Likes

Wow they’re really cooking

7 Likes

This is the parking deck correct?

2 Likes

I believe that the bottom part would be parking deck with office on top with some retail on the street level.

3 Likes

Or they’re going to be units occupied by mountain goats. :goat: :rofl:
Sorry, had to go there.

6 Likes

I am soooooooooooo glad that I am not alone in these types of thoughts! :crazy_face:

2 Likes

Noooo, The Mountain Goats live in Durham!

3 Likes

was walking this morning and was trying out my new phone,

17 Likes

An improvement over your last phone’s camera :+1:

9 Likes

So ture, and about time too.

18 Likes

Nice urban canyon! That will be a great picture when this is finished.

4 Likes