My wild guess, looking at the crane between the 83-1 and 82-2, It’s not going to be lifting real heavy loads in current configuration. Looks like the load at end of arm is a 12-1 leverage of for every 1000lb it lifted will need over 12,000 counter weight. Wild guess, the concrete floor parts of parking deck are around (40ftX6ft and average 1 foot thickness * 100lb per cubic foot) or 24, 000lb. I did not get good look at crane for Smoly2 deck, but last one I saw up close was building a 7 level deck here in Boone was so big that each tread filled a flat bed trailer on it’s own and never boomed out more than maybe 20 degrees.
for all us engineering novices, is there a “rule of thumb” for when we can expect a tower crane v. a mobile crane?
Those guesses don’t seem that wild.
All this crane talk is getting NSFW
Lots of erection in Raleigh RN.
I’ve been watching this all morning and counting how much more steel is left to go up. Crossing my fingers that I see a few trucks show up with more steel.
Wonder how long it’ll take to top out using steel. Any guesses out there?
Hard to say. Maybe by Easter?
By June at least
If SmoHo2 is any indication, it will rise pretty quickly.
That billboard does a nice job of filling in the space between the very core and Bloc83.
In the near future, Raleigh Crossing, 400H, RUSbus, and CAM block should fill in this view nicely.
Take that one again when she tops out.
There is more steel going up at 2 Hillsborough!
I think this is expected.
Is there a way to pin the webcam link somewhere?
Your best bet is to bookmark your comment so it’s easier to find.
.